Commit graph

65 commits

Author SHA1 Message Date
senke
dda301c905 [BE-API-009] be-api: Implement track search endpoint
- Added GET /tracks/search route in setupTrackRoutes
- Initialized TrackSearchService and set it in TrackHandler
- Handler SearchTracks and TrackSearchService already existed
- Supports query params: q, genre, artist, page, limit
- Service handles pagination, filtering, and returns tracks with pagination metadata

Phase: PHASE-2
Priority: P1
Progress: 18/267 (6.7%)
2025-12-23 10:45:08 +01:00
senke
15339a1221 [BE-API-008] be-api: Implement user search endpoint
- Created SearchUsers method in UserService with pagination support
- SearchUsers searches by username, email, first_name, and last_name using ILIKE
- Added SearchUsers handler in ProfileHandler with query params (q, page, limit)
- Added GET /users/search route in setupUserRoutes
- Returns paginated results with total count
- Password hashes are excluded from results

Phase: PHASE-2
Priority: P1
Progress: 17/267 (6.4%)
2025-12-23 10:42:26 +01:00
senke
d0a67a3d08 [BE-API-006] be-api: Implement chat stats endpoint
- Added GetStats method to ChatService with database access
- Returns active_users (distinct users who sent messages in last 24h)
- Returns total_messages (non-deleted messages count)
- Returns rooms_active (rooms with messages in last 24h)
- Added GetStats handler and GET /chat/stats route
- Updated ChatService to use NewChatServiceWithDB for database access

Phase: PHASE-2
Priority: P1
Progress: 15/267 (5.6%)
2025-12-23 01:51:49 +01:00
senke
325e58e755 [BE-API-002] api: Implement playlist collaborators endpoints
- Added routes in router.go: POST, GET, PUT, DELETE /playlists/:id/collaborators
- Applied RequireOwnershipOrAdmin middleware to POST, PUT, DELETE routes
- GET route accessible to collaborators (service layer checks permissions)
- Fixed UpdateCollaboratorPermission handler to use RespondWithAppError
- All handlers already existed in playlist_handler.go
- All endpoints properly authenticated and ownership checks enforced

Phase: PHASE-1
Priority: P0
Progress: 5/267 (1.9%)
2025-12-23 01:41:43 +01:00
senke
8592b3c76b [BE-API-001] api: Implement 2FA endpoints (setup, verify, disable)
- Created TwoFactorHandler with SetupTwoFactor, VerifyTwoFactor, DisableTwoFactor, GetTwoFactorStatus
- Added routes: POST /auth/2fa/setup, POST /auth/2fa/verify, POST /auth/2fa/disable, GET /auth/2fa/status
- Updated LoginResponse DTO to include requires_2fa flag
- Updated Login handler to check 2FA status and return requires_2fa flag when enabled
- Reused existing TwoFactorService (already had QR generation and TOTP verification)
- Added VerifyTOTPCode helper method to TwoFactorService
- All endpoints properly authenticated with RequireAuth middleware

Phase: PHASE-1
Priority: P0
Progress: 4/267 (1.5%)
2025-12-23 01:40:28 +01:00
senke
bacaded324 stabilizing apps/web: THIRD BATCH - FIXED Playwright 2025-12-21 18:55:51 -05:00
senke
df06693508 stabilizing apps/web: SECOND BATCH - FIXING Playwright 2025-12-17 12:20:42 -05:00
senke
b7b226d1d5 stabilizing veza-backend-api: P1 & P2 2025-12-16 13:34:08 -05:00
senke
3c534a59a0 stabilizing veza-backend-api: phase 1 2025-12-16 11:23:49 -05:00
senke
de191cf0fc refonte: backend-api go first; phase 1 2025-12-12 21:34:34 -05:00
okinrev
e9e306c347 report generation and future tasks selection 2025-12-08 19:57:54 +01:00
okinrev
843dff3c92 STABILISATION: phase 3–5 – API contract, tests & chat-server hardening 2025-12-06 17:21:59 +01:00
okinrev
1ef0e0d6d6 P0: stabilisation backend/chat/stream + nouvelle base migrations v1
Backend Go:
- Remplacement complet des anciennes migrations par la base V1 alignée sur ORIGIN.
- Durcissement global du parsing JSON (BindAndValidateJSON + RespondWithAppError).
- Sécurisation de config.go, CORS, statuts de santé et monitoring.
- Implémentation des transactions P0 (RBAC, duplication de playlists, social toggles).
- Ajout d’un job worker structuré (emails, analytics, thumbnails) + tests associés.
- Nouvelle doc backend : AUDIT_CONFIG, BACKEND_CONFIG, AUTH_PASSWORD_RESET, JOB_WORKER_*.

Chat server (Rust):
- Refonte du pipeline JWT + sécurité, audit et rate limiting avancé.
- Implémentation complète du cycle de message (read receipts, delivered, edit/delete, typing).
- Nettoyage des panics, gestion d’erreurs robuste, logs structurés.
- Migrations chat alignées sur le schéma UUID et nouvelles features.

Stream server (Rust):
- Refonte du moteur de streaming (encoding pipeline + HLS) et des modules core.
- Transactions P0 pour les jobs et segments, garanties d’atomicité.
- Documentation détaillée de la pipeline (AUDIT_STREAM_*, DESIGN_STREAM_PIPELINE, TRANSACTIONS_P0_IMPLEMENTATION).

Documentation & audits:
- TRIAGE.md et AUDIT_STABILITY.md à jour avec l’état réel des 3 services.
- Cartographie complète des migrations et des transactions (DB_MIGRATIONS_*, DB_TRANSACTION_PLAN, AUDIT_DB_TRANSACTIONS, TRANSACTION_TESTS_PHASE3).
- Scripts de reset et de cleanup pour la lab DB et la V1.

Ce commit fige l’ensemble du travail de stabilisation P0 (UUID, backend, chat et stream) avant les phases suivantes (Coherence Guardian, WS hardening, etc.).
2025-12-06 11:14:38 +01:00
okinrev
f3070f16f4 P0 UUID Phase A: migrations + backend Go UUID refactor 2025-12-04 02:15:48 +01:00
okinrev
2425c15b09 adding initial backend API (Go) 2025-12-03 20:29:37 +01:00