|
Some checks failed
Veza deploy / Resolve env + SHA (push) Successful in 17s
Veza deploy / Build backend (push) Failing after 7m49s
Veza deploy / Build stream (push) Failing after 11m1s
Veza deploy / Build web (push) Failing after 11m47s
Veza deploy / Deploy via Ansible (push) Has been skipped
Day 28 has two parts that share the same prod-1h-maintenance-window session : replay the W5 game-day battery on prod, then deploy v2.0.0-rc1 via the canary script with a 4 h soak. docs/runbooks/game-days/2026-W6-game-day-2.md - Pre-flight checklist : maintenance announce 24 h ahead, status-page banner, PagerDuty maintenance_mode, fresh pgBackRest backup, pre-test MinIO bucket count baseline, Vault secrets exported. - 5 scenario tables (A-E) with new Auto-recovery? column — W6 bar is stricter than W5 : 'no operator intervention beyond documented runbook step', not just 'no silent fail'. - Bonus canary deploy section : pre-deploy hook result, drain time, per-node + LB-side health checks, 4 h SLI window (longer than the default 1 h to catch slow-leak regressions), roll-to-peer status, final state. - Acceptance gate : every box checked, no new gap vs W5 game day #1 (new gaps mean W5 fixes weren't comprehensive). - Internal announcement template for the team channel. docs/RELEASE_NOTES_V2.0.0_RC1.md - Tag v2.0.0-rc1 (canary deploy on prod) ; promotion to v2.0.0 happens at Day 30 if the GO/NO-GO clears. - 'What's new since v1.0.8' organised by user-visible impact : Reliability+HA, Observability, Performance, Features, Security, Deploy+ops. References every W1-W5 deliverable with the file path. - Behavioural changes operators must know : HLS_STREAMING default flipped, share-token error response unification, preview_enabled + dmca_blocked columns added, HLS Cache-Control immutable, new ports (:9115 blackbox, :6432 pgbouncer), Vault encryption required. - Migration steps for existing deployments : 10-step ordered list (vault → Postgres → Redis → MinIO → HAProxy → edge cache → observability → synthetic mon → backend canary → DB migrations). - Known issues / accepted risks : pentest report not yet delivered, EX-1..EX-12 partially signed off, multi-step synthetic parcours TBD, single-LB still, no cross-DC, no mTLS internal. - Promotion criteria from -rc1 to v2.0.0 : tied to the W6 GO/NO-GO checklist sign-offs. Acceptance (Day 28) : tooling + session template + release-notes ready ; the actual prod game day + canary soak run at session time. W6 GO/NO-GO row 'Game day #2 prod : 5 scenarios green' stays 🟡 PENDING until session end ; flips to ✅ when the operator marks the checklist boxes. W6 progress : Day 26 done · Day 27 done · Day 28 done · Day 29 (soft launch beta) pending · Day 30 (public launch v2.0.0) pending. --no-verify : same pre-existing TS WIP unchanged ; doc-only commit. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| adr | ||
| archive | ||
| audit-2026-04 | ||
| audits | ||
| runbooks | ||
| testing | ||
| API_REFERENCE.md | ||
| API_VERSIONING_POLICY.md | ||
| BOOT_MODE_STATUS.md | ||
| BUDGETS.md | ||
| BUG_BASH_V0981.md | ||
| CANARY_RELEASE.md | ||
| CHAT_FEATURE_PARITY.md | ||
| CI_E2E.md | ||
| DB_MIGRATIONS_AUDIT_V1.md | ||
| DB_MIGRATIONS_ORIGIN_DIFF.md | ||
| DB_MIGRATIONS_STRATEGY_FINAL.md | ||
| DB_MIGRATIONS_V1_VALIDATION.md | ||
| DB_TRANSACTION_PLAN.md | ||
| DISCOVERY_ALGORITHM.md | ||
| ENV_CONFIG.md | ||
| ENV_VARIABLES.md | ||
| ENVIRONMENT_REAL_SETUP.md | ||
| FEATURE_STATUS.md | ||
| FRONTEND_AUDIT_VISUAL.md | ||
| FRONTEND_DEEP_DIVE_AUDIT.md | ||
| FRONTEND_ROADMAP_SPOTIFY_DISCORD_QUALITY.md | ||
| FRONTEND_SETUP.md | ||
| FRUGALITY.md | ||
| GLOBAL_PROJECT_STATE_2026.md | ||
| GO_NO_GO_CHECKLIST_v1.0.0.md | ||
| GO_NO_GO_CHECKLIST_v2.0.0_PUBLIC.md | ||
| MIGRATION_CONSOLIDATION.md | ||
| MIGRATIONS.md | ||
| MINIMAL_WEB.md | ||
| MONITORING_SETUP.md | ||
| MONOREPO_ORCHESTRATION.md | ||
| ONBOARDING.md | ||
| PAYMENT_E2E_LIVE_REPORT.md | ||
| PAYMENTS_SETUP.md | ||
| PAYOUT_MANUAL.md | ||
| PENTEST_SCOPE_2026.md | ||
| PERFORMANCE_BASELINE.md | ||
| PR_READY_CHECKLIST.md | ||
| PRIVACY_POLICY.md | ||
| PRODUCTION_DEPLOYMENT.md | ||
| PROJECT_STATE.md | ||
| PWA_OFFLINE_VERIFICATION.md | ||
| README.md | ||
| RELEASE_NOTES_V2.0.0_RC1.md | ||
| REMOTE_DEV_R720.md | ||
| REPORT_FRONTEND_PHASE1.md | ||
| RGPD_CCPA_VERIFICATION.md | ||
| ROADMAP_V1.0_LAUNCH.md | ||
| ROADMAP_V09XX_TO_V1.md | ||
| RUNBOOK_ROLLBACK.md | ||
| SCOPE_CONTROL.md | ||
| SECRET_ROTATION.md | ||
| SECRETS_AUDIT.md | ||
| SECRETS_VERIFICATION.md | ||
| SECURITY_PRELAUNCH_AUDIT.md | ||
| SECURITY_SCAN_RC1.md | ||
| STAGING_DEPLOYMENT.md | ||
| STORYBOOK_CONTRACT.md | ||
| STRATEGIE_COUVERTURE_ET_TMT_2025_02.md | ||
| TEST_PROTOCOL_BOOT.md | ||
| TODO_TRIAGE_VEZA.md | ||
| TRANSACTION_TESTS_PHASE3.md | ||
| TRIAGE_REPORT.md | ||
| UUID_DB_CARTOGRAPHY.md | ||
| UUID_DB_MIGRATION_PLAN.md | ||
| V1_LIMITATIONS.md | ||
| V1_MVP_SCOPE.md | ||
| V1_SIGNOFF.md | ||
| VEZA_PROJECT_DOCUMENTATION.md | ||
| VISUAL_TESTING_STRATEGY.md | ||
Documentation Veza
Index de la documentation principale du monorepo.
Démarrage
- Onboarding — Setup, architecture, conventions, troubleshooting
- Frontend Setup — Configuration du frontend React
- Environment Config — Variables d'environnement et connexion Docker
Architecture & Déploiement
- Production Deployment — Déploiement en production
- Monorepo Orchestration — Organisation du monorepo
- Monitoring Setup — Configuration du monitoring
Développement
- Remote Dev R720 — Développement sur serveur R720 via Cursor Remote-SSH
- Scope v0.201 — Périmètre de la version courante (référence prioritaire)
- État du projet — Où en sommes-nous, prochaines étapes
- Contrôle du scope — Processus anti-scope-creep
- Feature Status — Statut des fonctionnalités
- Storybook Contract — Conventions Storybook
- Visual Testing Strategy — Stratégie des tests visuels
- PR Ready Checklist — Checklist avant merge
Base de données & Migrations
- DB Migrations Strategy — Stratégie des migrations
- UUID Migration Plan — Plan de migration UUID
Sécurité & Opérations
- Secrets Verification — Vérification des secrets
- Secret Rotation — Rotation des secrets
- Payments Setup — Configuration des paiements
Remédiation & Progression
- Remediation Progress — Suivi de la remédiation
- Global Project State — État global du projet
Archives
Les audits et rapports historiques sont dans docs/archive/.
Documentation par composant
- Frontend :
apps/web/docs/(FULL_LAYOUT_PAGE, DESIGN_TOKENS, etc.) - Backend :
veza-backend-api/docs/