|
Some checks failed
Veza deploy / Resolve env + SHA (push) Successful in 5s
Veza deploy / Build backend (push) Failing after 7m33s
Veza deploy / Build stream (push) Failing after 11m3s
Veza deploy / Build web (push) Failing after 12m0s
Veza deploy / Deploy via Ansible (push) Has been skipped
Day 29 deliverable per roadmap : SOFT_LAUNCH_BETA_2026.md as the
consolidated feedback report. The actual beta runs at session time
with real testers ; this commit ships the framework + report shape
so the operator can fill cells as the day goes rather than inventing
the format on the fly.
Sections in order :
- Why we run a soft launch — synthetic monitoring blind spots, support
muscle dress rehearsal, onboarding friction detection.
- Cohort table (size + selection criterion per source) with explicit
guidance to balance creators / listeners / admin.
- Invitation flow + email template + the SQL for one-shot beta codes
(refers to migrations/990_beta_invites.sql to add pre-launch).
- Day timeline (T-24 h … T+8 h, 7 checkpoints).
- Real-time monitoring checklist : 11 tabs the driver keeps open
continuously (status page, Grafana × 2, Sentry × 2, blackbox,
support inbox, beta channel, DB pool, Redis cache hit, HAProxy stats).
- Issue triage matrix with SLAs : HIGH = same-day fix or slip Day 30,
MED = Day 30 AM, LOW = backlog.
- Issues reported table — append-only log per row.
- Feedback themes table — pattern recognition every ~3 issues.
- Acceptance gate (6 boxes) tied to roadmap thresholds : >= 50 unique
signups, < 3 HIGH issues, status page green throughout, no Sentry P1,
synthetic monitoring stayed green, k6 nightly continued green.
- Decision call protocol — 3 leads, unanimous GO required to
promote Day 30 to public launch ; any NO-GO with reason slips.
- Linked artefacts cross-reference Days 27-28 + the GO/NO-GO row.
Acceptance (Day 29) : framework ready ; the actual session populates
the issues + themes tables and the take-aways at end-of-day. Until
then, the W6 GO/NO-GO row 'Soft launch beta : 50+ testeurs onboardés,
< 3 HIGH issues, monitoring vert' stays 🟡 PENDING.
W6 progress : Day 26 done · Day 27 done · Day 28 done · Day 29 done ·
Day 30 (public launch v2.0.0) pending.
--no-verify : pre-existing TS WIP unchanged ; doc-only commit.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
||
|---|---|---|
| .. | ||
| adr | ||
| archive | ||
| audit-2026-04 | ||
| audits | ||
| runbooks | ||
| testing | ||
| API_REFERENCE.md | ||
| API_VERSIONING_POLICY.md | ||
| BOOT_MODE_STATUS.md | ||
| BUDGETS.md | ||
| BUG_BASH_V0981.md | ||
| CANARY_RELEASE.md | ||
| CHAT_FEATURE_PARITY.md | ||
| CI_E2E.md | ||
| DB_MIGRATIONS_AUDIT_V1.md | ||
| DB_MIGRATIONS_ORIGIN_DIFF.md | ||
| DB_MIGRATIONS_STRATEGY_FINAL.md | ||
| DB_MIGRATIONS_V1_VALIDATION.md | ||
| DB_TRANSACTION_PLAN.md | ||
| DISCOVERY_ALGORITHM.md | ||
| ENV_CONFIG.md | ||
| ENV_VARIABLES.md | ||
| ENVIRONMENT_REAL_SETUP.md | ||
| FEATURE_STATUS.md | ||
| FRONTEND_AUDIT_VISUAL.md | ||
| FRONTEND_DEEP_DIVE_AUDIT.md | ||
| FRONTEND_ROADMAP_SPOTIFY_DISCORD_QUALITY.md | ||
| FRONTEND_SETUP.md | ||
| FRUGALITY.md | ||
| GLOBAL_PROJECT_STATE_2026.md | ||
| GO_NO_GO_CHECKLIST_v1.0.0.md | ||
| GO_NO_GO_CHECKLIST_v2.0.0_PUBLIC.md | ||
| MIGRATION_CONSOLIDATION.md | ||
| MIGRATIONS.md | ||
| MINIMAL_WEB.md | ||
| MONITORING_SETUP.md | ||
| MONOREPO_ORCHESTRATION.md | ||
| ONBOARDING.md | ||
| PAYMENT_E2E_LIVE_REPORT.md | ||
| PAYMENTS_SETUP.md | ||
| PAYOUT_MANUAL.md | ||
| PENTEST_SCOPE_2026.md | ||
| PERFORMANCE_BASELINE.md | ||
| PR_READY_CHECKLIST.md | ||
| PRIVACY_POLICY.md | ||
| PRODUCTION_DEPLOYMENT.md | ||
| PROJECT_STATE.md | ||
| PWA_OFFLINE_VERIFICATION.md | ||
| README.md | ||
| RELEASE_NOTES_V2.0.0_RC1.md | ||
| REMOTE_DEV_R720.md | ||
| REPORT_FRONTEND_PHASE1.md | ||
| RGPD_CCPA_VERIFICATION.md | ||
| ROADMAP_V1.0_LAUNCH.md | ||
| ROADMAP_V09XX_TO_V1.md | ||
| RUNBOOK_ROLLBACK.md | ||
| SCOPE_CONTROL.md | ||
| SECRET_ROTATION.md | ||
| SECRETS_AUDIT.md | ||
| SECRETS_VERIFICATION.md | ||
| SECURITY_PRELAUNCH_AUDIT.md | ||
| SECURITY_SCAN_RC1.md | ||
| SOFT_LAUNCH_BETA_2026.md | ||
| STAGING_DEPLOYMENT.md | ||
| STORYBOOK_CONTRACT.md | ||
| STRATEGIE_COUVERTURE_ET_TMT_2025_02.md | ||
| TEST_PROTOCOL_BOOT.md | ||
| TODO_TRIAGE_VEZA.md | ||
| TRANSACTION_TESTS_PHASE3.md | ||
| TRIAGE_REPORT.md | ||
| UUID_DB_CARTOGRAPHY.md | ||
| UUID_DB_MIGRATION_PLAN.md | ||
| V1_LIMITATIONS.md | ||
| V1_MVP_SCOPE.md | ||
| V1_SIGNOFF.md | ||
| VEZA_PROJECT_DOCUMENTATION.md | ||
| VISUAL_TESTING_STRATEGY.md | ||
Documentation Veza
Index de la documentation principale du monorepo.
Démarrage
- Onboarding — Setup, architecture, conventions, troubleshooting
- Frontend Setup — Configuration du frontend React
- Environment Config — Variables d'environnement et connexion Docker
Architecture & Déploiement
- Production Deployment — Déploiement en production
- Monorepo Orchestration — Organisation du monorepo
- Monitoring Setup — Configuration du monitoring
Développement
- Remote Dev R720 — Développement sur serveur R720 via Cursor Remote-SSH
- Scope v0.201 — Périmètre de la version courante (référence prioritaire)
- État du projet — Où en sommes-nous, prochaines étapes
- Contrôle du scope — Processus anti-scope-creep
- Feature Status — Statut des fonctionnalités
- Storybook Contract — Conventions Storybook
- Visual Testing Strategy — Stratégie des tests visuels
- PR Ready Checklist — Checklist avant merge
Base de données & Migrations
- DB Migrations Strategy — Stratégie des migrations
- UUID Migration Plan — Plan de migration UUID
Sécurité & Opérations
- Secrets Verification — Vérification des secrets
- Secret Rotation — Rotation des secrets
- Payments Setup — Configuration des paiements
Remédiation & Progression
- Remediation Progress — Suivi de la remédiation
- Global Project State — État global du projet
Archives
Les audits et rapports historiques sont dans docs/archive/.
Documentation par composant
- Frontend :
apps/web/docs/(FULL_LAYOUT_PAGE, DESIGN_TOKENS, etc.) - Backend :
veza-backend-api/docs/