veza/docs/archive/root-md/PHASE_3_CLOSURE.md
senke 43af35fd93 chore(audit 2.2, 2.3): nettoyer .md et .json à la racine
- Archiver 131 .md dans docs/archive/root-md/
- Archiver 22 .json dans docs/archive/root-json/
- Conserver 7 .md utiles (README, CONTRIBUTING, CHANGELOG, etc.)
- Conserver package.json, package-lock.json, turbo.json
- Ajouter README d'index dans chaque archive
2026-02-15 14:35:08 +01:00

1.9 KiB

MISSION CLOSURE: PHASE 3

Status: SUCCESS Date: 2024-12-07

🚀 Mission Overview

The "Veza Remediation & Hardening" mission is complete. We have successfully transitioned the project from a fragile state to a Production-Ready Candidate.

Key Achievements

  1. Stability:

    • Backend Workers no longer block threads (Starvation bug fixed).
    • Backend Workers automatically recover from crashes (Zombie Rescue implemented).
    • Chat Server cleans up zombie connections (Heartbeat implemented).
    • Stream Server uses Graceful Shutdown instead of abort.
  2. Security:

    • Chat Server enforces strict JWT Authentication.
    • Chat Server validates audience claims correctly (Array/String interoperability fixed).
    • Chat Server validates content length and format.
  3. Observability:

    • Prometheus metrics implemented for Backend and Chat Server.
    • Real-time CPU/RAM monitoring added.
  4. DevOps & Quality:

    • Legacy migrations (migrations_legacy/) deleted.
    • Codebase swept for TODOs (docs/TODO_TRIAGE_VEZA.md).
    • CI Pipeline created (.github/workflows/ci.yml).
    • PR Checklist created (docs/PR_READY_CHECKLIST.md).

⚠️ Remaining Known Issues (P2)

These issues prevent a "Perfect" score but do not block the release candidate.

  1. Stream Server Compilation:
    • Requires active PostgreSQL connection for sqlx::query!.
    • Mitigation: Use sqlx prepare --check in CI or provide sqlx-data.json.
  2. Stream Server Sync Logic:
    • sync.rs contains stub implementation for WebSocket dispatch.
    • Mitigation: Functional but features limited (no real-time sync events sent).

🏁 Next Steps

  1. Merge remediation/full_audit_fix into main.
  2. Deploy to Staging Environment.
  3. Run the CI pipeline.
  4. Schedule P2 items (Stream Sync, Offline Build) for next Sprint.

Mission Accomplished.