- Archiver 131 .md dans docs/archive/root-md/ - Archiver 22 .json dans docs/archive/root-json/ - Conserver 7 .md utiles (README, CONTRIBUTING, CHANGELOG, etc.) - Conserver package.json, package-lock.json, turbo.json - Ajouter README d'index dans chaque archive
47 lines
1.9 KiB
Markdown
47 lines
1.9 KiB
Markdown
# MISSION CLOSURE: PHASE 3
|
|
|
|
**Status**: SUCCESS
|
|
**Date**: 2024-12-07
|
|
|
|
## 🚀 Mission Overview
|
|
The "Veza Remediation & Hardening" mission is complete. We have successfully transitioned the project from a fragile state to a **Production-Ready Candidate**.
|
|
|
|
### Key Achievements
|
|
1. **Stability**:
|
|
- Backend Workers no longer block threads (Starvation bug fixed).
|
|
- Backend Workers automatically recover from crashes (Zombie Rescue implemented).
|
|
- Chat Server cleans up zombie connections (Heartbeat implemented).
|
|
- Stream Server uses Graceful Shutdown instead of abort.
|
|
|
|
2. **Security**:
|
|
- Chat Server enforces strict JWT Authentication.
|
|
- Chat Server validates audience claims correctly (Array/String interoperability fixed).
|
|
- Chat Server validates content length and format.
|
|
|
|
3. **Observability**:
|
|
- Prometheus metrics implemented for Backend and Chat Server.
|
|
- Real-time CPU/RAM monitoring added.
|
|
|
|
4. **DevOps & Quality**:
|
|
- Legacy migrations (`migrations_legacy/`) deleted.
|
|
- Codebase swept for TODOs (`docs/TODO_TRIAGE_VEZA.md`).
|
|
- CI Pipeline created (`.github/workflows/ci.yml`).
|
|
- PR Checklist created (`docs/PR_READY_CHECKLIST.md`).
|
|
|
|
## ⚠️ Remaining Known Issues (P2)
|
|
These issues prevent a "Perfect" score but do not block the release candidate.
|
|
|
|
1. **Stream Server Compilation**:
|
|
- Requires active PostgreSQL connection for `sqlx::query!`.
|
|
- **Mitigation**: Use `sqlx prepare --check` in CI or provide `sqlx-data.json`.
|
|
2. **Stream Server Sync Logic**:
|
|
- `sync.rs` contains stub implementation for WebSocket dispatch.
|
|
- **Mitigation**: Functional but features limited (no real-time sync events sent).
|
|
|
|
## 🏁 Next Steps
|
|
1. **Merge** `remediation/full_audit_fix` into `main`.
|
|
2. **Deploy** to Staging Environment.
|
|
3. **Run** the CI pipeline.
|
|
4. **Schedule** P2 items (Stream Sync, Offline Build) for next Sprint.
|
|
|
|
**Mission Accomplished.**
|