First-attempt commit3a5c6e184only captured the .gitignore change; the pre-commit hook silently dropped the 343 staged moves/deletes during lint-staged's "no matching task" path. This commit re-applies the intended J1 content on top ofbec75f143(which was pushed in parallel). Uses --no-verify because: - J1 only touches .md/.json/.log/.png/binaries — zero code that would benefit from lint-staged, typecheck, or vitest - The hook demonstrated it corrupts pure-rename commits in this repo - Explicitly authorized by user for this one commit Changes (343 total: 169 deletions + 174 renames): Binaries purged (~167 MB): - veza-backend-api/{server,modern-server,encrypt_oauth_tokens,seed,seed-v2} Generated reports purged: - 9 apps/web/lint_report*.json (~32 MB) - 8 apps/web/tsc_*.{log,txt} + ts_*.log (TS error snapshots) - 3 apps/web/storybook_*.json (1375+ stored errors) - apps/web/{build_errors*,build_output,final_errors}.txt - 70 veza-backend-api/coverage*.out + coverage_groups/ (~4 MB) - 3 veza-backend-api/internal/handlers/*.bak Root cleanup: - 54 audit-*.png (visual regression baselines, ~11 MB) - 9 stale MVP-era scripts (Jan 27, hardcoded v0.101): start_{iteration,mvp,recovery}.sh, test_{mvp_endpoints,protected_endpoints,user_journey}.sh, validate_v0101.sh, verify_logs_setup.sh, gen_hash.py Session docs archived (not deleted — preserved under docs/archive/): - 78 apps/web/*.md → docs/archive/frontend-sessions-2026/ - 43 veza-backend-api/*.md → docs/archive/backend-sessions-2026/ - 53 docs/{RETROSPECTIVE_V,SMOKE_TEST_V,PLAN_V0_,V0_*_RELEASE_SCOPE, AUDIT_,PLAN_ACTION_AUDIT,REMEDIATION_PROGRESS}*.md → docs/archive/v0-history/ README.md and CONTRIBUTING.md preserved in apps/web/ and veza-backend-api/. Note: The .gitignore rules preventing recurrence were already pushed in3a5c6e184and remain in place — this commit does not modify .gitignore. Refs: AUDIT_REPORT.md §11
2.5 KiB
2.5 KiB
Statut Finalisation Frontend - Vue d'Ensemble
Date: 2025-01-27
Statut: 🔄 Multi-phases en cours - Progrès significatifs
✅ Accomplissements Totaux
Phase 1: Tests Composants UI Critiques ✅ COMPLÉTÉE
- ✅ 6 composants testés avec 46 tests
- ✅ Tous les tests passent
Phase 2: Tests Composants UI Restants 🔄 EN COURS
- ✅ 13 composants testés avec ~76 tests
- ⏳ 15 composants restants
Phase 3: Tests Services 🔄 DÉMARRÉE
- ✅ 2 services testés avec ~15 tests
- ⏳ 15 services restants
Phase 4: Tests Context & Hooks 🔄 DÉMARRÉE
- ✅ 2 Context testés avec ~10 tests
- ⏳ 3 Context + ~21 hooks restants
📊 Statistiques Globales
Tests Créés
- Phase 1: 46 tests (6 composants) ✅
- Phase 2: ~76 tests (13 composants) 🔄
- Phase 3: ~15 tests (2 services) 🔄
- Phase 4: ~10 tests (2 Context) 🔄
- Total: ~147 tests créés
Progression
- ✅ 13 composants UI testés (46% complété)
- ⏳ 15 composants UI restants (54%)
- ⏳ 2 services testés (12% complété)
- ⏳ 15 services restants (88%)
- ⏳ 2 Context testés (40% complété)
- ⏳ 3 Context + ~21 hooks restants (60%)
🎯 Prochaines Étapes Systématiques
1. Finaliser Tests Créés (Priorité Immédiate)
- ⏳ Corriger erreurs restantes dans tests créés
- ⏳ Vérifier que tous les tests passent
2. Continuer Phase 2 (15 composants UI restants)
- ⏳ Créer tests pour composants restants
- ⏳ Estimation: 2 semaines
3. Continuer Phase 3 (15 services restants)
- ⏳ Créer tests pour services restants
- ⏳ Estimation: 3 semaines
4. Continuer Phase 4 (3 Context + ~21 hooks restants)
- ⏳ Créer tests pour Context et hooks restants
- ⏳ Estimation: 2 semaines
5. Corriger Tests Existants (163 fichiers)
- ⏳ Utiliser guide et script créés
- ⏳ Estimation: 1-2 semaines
📈 Objectifs
Atteints ✅
- ✅ Phase 1 complétée
- ✅ Phase 2 démarrée (46% complété)
- ✅ Phase 3 démarrée (12% complété)
- ✅ Phase 4 démarrée (40% complété)
- ✅ ~147 tests créés
Objectifs Finaux 🎯
- 🎯 28 composants UI testés (100%)
- 🎯 17 services testés (100%)
- 🎯 5 Context + ~21 hooks testés (100%)
- 🎯 0 tests échouants (100%)
- 🎯 80%+ couverture globale
Le frontend progresse systématiquement vers l'objectif de 80%+ de couverture de tests.
Dernière mise à jour: 2025-01-27