veza/docs/archive/frontend-sessions-2026/STATUT_FINALISATION.md
senke 0e7097ed1b chore(cleanup): J1 — purge 220MB debris, archive session docs (complete)
First-attempt commit 3a5c6e184 only captured the .gitignore change; the
pre-commit hook silently dropped the 343 staged moves/deletes during
lint-staged's "no matching task" path. This commit re-applies the intended
J1 content on top of bec75f143 (which was pushed in parallel).

Uses --no-verify because:
- J1 only touches .md/.json/.log/.png/binaries — zero code that would
  benefit from lint-staged, typecheck, or vitest
- The hook demonstrated it corrupts pure-rename commits in this repo
- Explicitly authorized by user for this one commit

Changes (343 total: 169 deletions + 174 renames):

Binaries purged (~167 MB):
- veza-backend-api/{server,modern-server,encrypt_oauth_tokens,seed,seed-v2}

Generated reports purged:
- 9 apps/web/lint_report*.json (~32 MB)
- 8 apps/web/tsc_*.{log,txt} + ts_*.log (TS error snapshots)
- 3 apps/web/storybook_*.json (1375+ stored errors)
- apps/web/{build_errors*,build_output,final_errors}.txt
- 70 veza-backend-api/coverage*.out + coverage_groups/ (~4 MB)
- 3 veza-backend-api/internal/handlers/*.bak

Root cleanup:
- 54 audit-*.png (visual regression baselines, ~11 MB)
- 9 stale MVP-era scripts (Jan 27, hardcoded v0.101):
  start_{iteration,mvp,recovery}.sh,
  test_{mvp_endpoints,protected_endpoints,user_journey}.sh,
  validate_v0101.sh, verify_logs_setup.sh, gen_hash.py

Session docs archived (not deleted — preserved under docs/archive/):
- 78 apps/web/*.md     → docs/archive/frontend-sessions-2026/
- 43 veza-backend-api/*.md → docs/archive/backend-sessions-2026/
- 53 docs/{RETROSPECTIVE_V,SMOKE_TEST_V,PLAN_V0_,V0_*_RELEASE_SCOPE,
          AUDIT_,PLAN_ACTION_AUDIT,REMEDIATION_PROGRESS}*.md
                        → docs/archive/v0-history/

README.md and CONTRIBUTING.md preserved in apps/web/ and veza-backend-api/.

Note: The .gitignore rules preventing recurrence were already pushed in
3a5c6e184 and remain in place — this commit does not modify .gitignore.

Refs: AUDIT_REPORT.md §11
2026-04-14 17:12:03 +02:00

92 lines
2.5 KiB
Markdown

# Statut Finalisation Frontend - Vue d'Ensemble
**Date:** 2025-01-27
**Statut:** 🔄 **Multi-phases en cours - Progrès significatifs**
---
## ✅ Accomplissements Totaux
### Phase 1: Tests Composants UI Critiques ✅ COMPLÉTÉE
-**6 composants** testés avec **46 tests**
- ✅ Tous les tests passent
### Phase 2: Tests Composants UI Restants 🔄 EN COURS
-**13 composants** testés avec **~76 tests**
-**15 composants restants**
### Phase 3: Tests Services 🔄 DÉMARRÉE
-**2 services** testés avec **~15 tests**
-**15 services restants**
### Phase 4: Tests Context & Hooks 🔄 DÉMARRÉE
-**2 Context** testés avec **~10 tests**
-**3 Context + ~21 hooks restants**
---
## 📊 Statistiques Globales
### Tests Créés
- **Phase 1:** 46 tests (6 composants) ✅
- **Phase 2:** ~76 tests (13 composants) 🔄
- **Phase 3:** ~15 tests (2 services) 🔄
- **Phase 4:** ~10 tests (2 Context) 🔄
- **Total:** **~147 tests créés**
### Progression
-**13 composants UI testés** (46% complété)
-**15 composants UI restants** (54%)
-**2 services testés** (12% complété)
-**15 services restants** (88%)
-**2 Context testés** (40% complété)
-**3 Context + ~21 hooks restants** (60%)
---
## 🎯 Prochaines Étapes Systématiques
### 1. Finaliser Tests Créés (Priorité Immédiate)
- ⏳ Corriger erreurs restantes dans tests créés
- ⏳ Vérifier que tous les tests passent
### 2. Continuer Phase 2 (15 composants UI restants)
- ⏳ Créer tests pour composants restants
- ⏳ Estimation: 2 semaines
### 3. Continuer Phase 3 (15 services restants)
- ⏳ Créer tests pour services restants
- ⏳ Estimation: 3 semaines
### 4. Continuer Phase 4 (3 Context + ~21 hooks restants)
- ⏳ Créer tests pour Context et hooks restants
- ⏳ Estimation: 2 semaines
### 5. Corriger Tests Existants (163 fichiers)
- ⏳ Utiliser guide et script créés
- ⏳ Estimation: 1-2 semaines
---
## 📈 Objectifs
### Atteints ✅
-**Phase 1 complétée**
-**Phase 2 démarrée** (46% complété)
-**Phase 3 démarrée** (12% complété)
-**Phase 4 démarrée** (40% complété)
-**~147 tests créés**
### Objectifs Finaux 🎯
- 🎯 **28 composants UI testés** (100%)
- 🎯 **17 services testés** (100%)
- 🎯 **5 Context + ~21 hooks testés** (100%)
- 🎯 **0 tests échouants** (100%)
- 🎯 **80%+ couverture globale**
---
**Le frontend progresse systématiquement vers l'objectif de 80%+ de couverture de tests.**
**Dernière mise à jour:** 2025-01-27